Our genius is valves ®
old-bailey

7-10 Old Bailey

Project Overview

Location

London, UK

Client

MWB Group Ltd 

Architect / Consulting Engineer

Sidell Gibson Architects and Avery Associates

Contractor

Bowen

Distributor

Pipe Centre (Bermondsey) Ltd

Specification

Crane FS Commpac Manifold Systems
Download case study as PDF

CommPac manifolds from Crane Fluid Systems have been installed in the heating and cooling system of this London office building. The construction of No. 7-10 Old Bailey has been designed so that the 6700sqm of new office space can be easily divided into separate units.

Crane's CommPac manifold commissioning system provides one easy point for commissioning multiple terminal units. All site connections can be made without the need to access the internal components, a feature that dramatically reduces commissioning costs and time.

Related Projects
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study
picadilly-gate
Public Sector
Piccadilly Gate

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Read Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
dubai-mall
Commercial
The Dubai Mall, UAE

Claimed to be the largest mall in the world – opening with more than 1200 stores.

DownloadRead Case Study