Our genius is valves ®
The-Avenue

Phase III, The Avenues

Project Overview

Location

Kuwait City, Kuwait

Developers

Gensler (London & Los Angeles), Mabanee Co.

Contractors

Bader Al Mulla

Distributor

Asia Electro-Mechanical

Specification

A wide range of traditional and commissioning valves from Crane FS
Download case study as PDF

Phase 3 of Kuwait’s largest shopping destination was completed in 2012 and consists of more than 86,000 square metres of retail space. Located in the Al Rai district of Kuwait City, the mall was designed by London and Los Angeles offices of Gensler, in conjunction with Kuwait developers, Mabanee.

The completed third phase houses 545 retail units. This stage of the project was awarded to Bader Al Mulla, one of Kuwait’s top MEP contractors on a very tight time-scale. Crane Fluid Systems together with their distributor, Asia Electro-Mechanical, committed to holding valve stocks in Kuwait to service this project and ensure no delays. This was a key factor in persuading Bader Al Mulla to place the order for the complete range of valves with Asia / Crane FS.

The first phase of the project opened in April 2007 and includes the largest IKEA in the region, the first Carrefour supermarket in Kuwait and a 10 screen cinema complex. The building design is inspired by the natural forms and elements of the desert. It is also built using environmentally friendly techniques which utilise natural sunlight.

The completed mall includes more than 100 restaurants, a spa, an entertainment centre, a boutique mall, hotels, offices, a convention centre and a theatre.

Published: 2007
Related Projects
dubai-mall
Commercial
The Dubai Mall, UAE

Claimed to be the largest mall in the world – opening with more than 1200 stores.

DownloadRead Case Study
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
egypt-skyline
Retail
Mall of Egypt

Crane FS has supplied a range of general valves to the Mall of Egypt, a five star complex which will include a ski dome.

Read Case Study
beirut
Medical
Clemenceau Medical Center CMC, Beirut

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

DownloadRead Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study